Temporary Construction Meter

The Department offers contractors the use of a 3/4" meter which must be set in a secured, insulated or heated area on their construction site. 

A deposit of $400.00 will be required prior to the meter set.

The meter will removed when the permanent meter is set. 

At such time, consumption and fees will be calculated and a bill will be generated against the deposit.  A bill or a refund will be issued.  

Please click link below for details: